Hatem Medhat Esawy

Planning Engineer

خبرة 17 عام

الشيخ زايد الحى الخامس

عدد ساعات العمل الاسبوعية 32 ساعة

أجر الساعة : 5$

نبذه عن المهندس

Bachelor degree in Construction engineering with 17 years overall experience at high rise and Administrative  buildings, high voltage substations projects, infrastructure projects, excellent knowledge of project management scheduling monitoring and control, good communication & negotiation skills.

Have a successful previous experience at multinational organizations with a challenge always to meet target before deadline according to the required quality and add value refer to the organization policies.

Graduation Date: May/2004

Worked at:
Redcon construction
HASSAN ALLAM Construction
EHAF Consulting
SAUDI BINLADIN GROUP
SEMENS for power transmission, QATAR
IGI Group‐GINZA Company

المهارات

  • تطوير الجداول الزمنية
  • بريمافيرا
  • مراقبة وضمان الجودة
  • المطالبات الزمنية والتعاقدية
  • التخطيط
  • وضع خطة لبناء المشاريع

الدراسة

Construction engineering - Bachelor Degree 6october university - faculty of engineering 1999/10/01 - 2004/05/30

الخبرات

REDCON Construction | project planning manager New Alamien City High Rise Building Involved in (The Gate Tower) Project,  ‐ Job Description:  Responsible for leading a planning team to creating the project time schedule (Baseline),  Revised time schedules, Recovery Plans Submitting,  monitoring, weekly & monthly reports submitting,  manpower & resources Plan, Key Performance indicators monitoring, EOT’s & time claims Creating. 2020/12/01 - 2021/09/30

HASSAN ALLAM Construction | Senior Planning Engineer Infrastructure Involved in several Infrastructure Projects, (EAST PORT SAID INDUSTRIAL AREA, South of New Alamien City, New Zayed City Extension, Greater Cairo Metro Line 4) Infrastructure projects  ‐ Job Description:  Responsible for creating the project time schedule (Baseline),  Revised time schedules, Recovery Plans Submitting,  monitoring, weekly & monthly reports submitting,  manpower & resources Plan, cash Flow Planned  & Actual situation comparing, EOT’s & time claims Creating 2018/03/01 - 2020/09/01

EHAF Consulting | Senior Planning Engineer Al Azhar New Library Involved Al Azhar New Library project  At Salah Salem St. (6 floor with total height  25m and 400,000,000LE Budget Cost)  ‐ Job Description:  Responsible for review the project time schedule (Baseline),  Revised time schedules, Claims review and study,  Mentoring, weekly & monthly reports submitting   (reporting to PM RW Armstrong),  Weekly time schedule, manpower, resources, cash  Flow Planned & Actual situation comparing.
 
2016/08/01 - 2018/03/01

SAUDI BINLADIN GROUP, SAUDI ARABIA  | Senior Planning Engineer Expansion of Holy HARAM & Surrounding Area  Involved Security Building‐Plot 1 Project that Consists of  (22 floor with total height 115m, total area 230.000m.s   And 700,000,000SR Skelton Budget Cost)  ‐ Job Description :  Responsible for creating the project time schedule (Baseline),  Revised time schedules, time, cost and recourses  Mentoring, weekly & monthly reports submitting,  Weekly time schedule, manpower, resources, cash  Flow Planned & Actual situation comparing. 2012/01/01 - 2016/03/01

SAFWA Company | Senior Planning Engineer Egyptian Kuwaiti Building project at Smart Village  Involved Egyptian Kuwaiti Administrative Building project  At Smart Village that Consists of (6 floor with total height  25m and 120,000,000LE Skelton Budget Cost)  ‐ Job Description :  Responsible for creating the project time schedule (Baseline),  Revised time schedules, time, cost and recourses  Mentoring, weekly & monthly reports submitting,  Weekly time schedule, manpower, resources, cash  Flow Planned & Actual situation comparing. 2010/01/01 - 2011/12/30

SEMENS for power transmission, QATAR    |  Planning Engineer High voltage electrical substations  Involved in a different project phases like  (Phase 7 projects Substations with 933,700,000US B.C) (Phase 8 power cables Project 164,800,000US B.C) (Qatar for chemical industrial substation 43,950,000US B.C) ‐ Job Description :  Worked with a planning team work with a shared  Responsibility for creating the project time schedule (Baseline),  Revised time schedules, time, cost and recourses  Mentoring, weekly & monthly reports submitting,  Weekly time schedule, manpower, resources, cash  Flow Planned & Actual situation comparing and  Planning Department Presentations. 2007/12/01 - 2009/12/30

IGI Group‐GINZA Company | Tenders Office Engineer Construction and Real Estate Development  Involved in a different projects Tender Study.  ‐ Job Description :  Worked in a Tender team work with a shared  Responsibility for project tender cost study,  Civil items cost study, quantities surveying  Tender plan & time schedule creating. 2004/08/01 - 2007/12/01

سابقة الأعمال