امكانية تقديم كميات للمبنى المطلوب باعلى جودة ودقة ضمن الوقت المحدد
Detailed BOQ including MEP
- Belal
- 16-07-2023
- منذ 10 شهر 7 يوم
- عدد العروض : 8
- مغلق
الميزانية المقترحة : غير محدد
وصف المشروع
we are seeking for a QS Engineer to estimate all the Quantities very detailed for Architectural Finishes items & MEP items in Project (3Basements + Ground floor + 9 Typical Floor + Roof) within 4 days only , noting that we don't want Concrete , Block work & plaster quantities as it's
already done,
.Note: i will attach some plans only as the full drawings are very large to be attached
Thanks
المهارات المطلوبة
- حصر الكميات
- الحصر/ المناقصات
مرفقات
جميع عروض التسعير
متوسط العروض : $340
-
16-07-2023منذ 10 شهر 6 يوم
-
Hello dear ..,
With you, the civil engineer, Mahmoud.. specializes in calculating quantities and has 5 years of experience in this field.. $190 will get:
- Accurate quantities calculation file for architectural, finishing, mechanical and electrical industries
- Quantities calculation file, easy to read and arranged
Do not hesitate to contact me for details or request samples17-07-2023منذ 10 شهر 5 يوم -
مهندس مدني و مقاولات.
لدي الخبرة الكاملة و الدقيقة في حساب الكميات و جداول BOQ .
وتسليم العمل في الوقف المطلوب18-07-2023منذ 10 شهر 5 يوم -
حسب الوقت المتفق عليه يتم تسليم الأعمال بحد ادني كل يومين تسليم دور افقي سواء البدروم أو الاول او المتكرر أو السطح
18-07-2023منذ 10 شهر 4 يوم -
اعمال حصر الكميات وجدول كميات المشروع
18-07-2023منذ 10 شهر 4 يوم -
تقسيم حصر المشروع على 4 أيام
23-07-2023منذ 9 شهر 29 يوم -
يتم احتساب 4 ايام عمل بعد تسلم الرسومات الخاصه بالأنظمه الكهربائية وانظمة التيار الخفيف والمواصفات القياسيه للمشروع
سوف يتم عمل حصر لكل اعمال الكهرباء بدءا من المواسير واقطارها واطوالها وكذك حوامل الكابلات مرورا بالكابلات والاسلاك ثم الاجهزه النهائية
1st fix, 2nd fix & 3rd fix25-07-2023منذ 9 شهر 27 يوم -
تقديم حصر كميات و تنفيذ المطلوب علي اكمل وجه
اخراج من برنامج الرفيت28-07-2023منذ 9 شهر 24 يوم